Milestone crunch
A DD or CD issue date is fixed, and the telecom sheets are still behind the rest of the set.
Part-time or project-based telecommunications design capacity for architecture and engineering firms. Telecom drawings, Division 27 specifications, and construction-administration responses, produced in your standards and returned for your review.
Overflow support works best when the telecom scope is real but temporary, uneven, or more specialized than your team usually handles.
A DD or CD issue date is fixed, and the telecom sheets are still behind the rest of the set.
Several projects need Division 27 work in the same few weeks, and your team cannot cover all of it.
You have steady telecom work, but not enough to justify another full-time designer.
The project needs MDF/IDF layouts, rack elevations, backbone diagrams, or a spec rewrite your team rarely does.
RFIs, submittals, and bulletins are arriving faster than the original designer can answer them.
The owner or RFP asks for RCDD-led design or review, and the requirement needs a real design role.
Every engagement is scoped to specific sheets, sections, or tasks. These are the pieces A/E teams most often hand off.
Telecom sheets produced in your title block, layers, and sheet numbering.
Division 27 sections edited from your master, the owner standard, or a project template.
Responses drafted for your review and issued through your CA process.
For the full scope of a telecom package, see Division 27 telecommunications design, MDF and IDF room design, and structured cabling design.
The goal is for the telecom sheets to look and read like the rest of your set, with no surprises at your QA review.
Backgrounds, title block, CAD or BIM standards, specification master, owner standards, and the milestone dates you have to hit.
A short written scope lists the sheets, sections, review cycles, meetings, and who reviews, signs, and issues each deliverable.
Work happens in your file platform and naming convention, with a drawing register so both sides see the same status.
Scheduled check-ins and a running open-item log. Questions go to one named contact on your team rather than piling up until the deadline.
Each package is checked for completeness, sheet-to-sheet consistency, and drawing-to-spec agreement before your reviewer sees it.
Deliverables come back through your transmittal path. Redlines are tracked to closure so nothing is lost between rounds.
When we work under your firm, your firm normally issues the documents and keeps final review and professional responsibility under its own contract. We are responsible for our work within the agreed scope, and RCDD review is included when the scope calls for it.
ICT Design Partners is not a professional engineering firm and does not seal engineering drawings. If the AHJ or contract needs a PE seal, that stays with the licensed professional responsible for the work. The RCDD vs. PE comparison explains the difference.
Rates are quoted after a short scope review. There is no published rate card, because the right number depends on the package.
A standing block of capacity for firms with a steady flow of telecom work. Good for multiple projects at different phases.
A set list of sheets, sections, and review cycles for one project, at a fee agreed before work starts.
For CA support or work that is hard to size in advance. Billed against actual time, up to an agreed ceiling.
See how design fees are scoped for the factors that drive cost.
Have a different question? Ask it directly.
You don’t need drawings to start. These details are enough to confirm fit and availability.
Controlled documents: do not send CUI, ITAR-controlled, export-controlled, or classified material through the website or ordinary email.
Tell us the project, the phase, and what you want to hand off. You'll get a direct answer on fit, scope, and start date within one business day.