Basis of design and criteria
Project requirements, owner standards, applicable references, system boundaries, assumptions, field inputs, and acceptance criteria organized before production starts.
Coordinated communications contract documents for A/E firms, general contractors, design-builders, and building owners. The work connects technical requirements to plans, schedules, details, testing, and named responsibility boundaries.
The exact issue set follows the project phase and contract. Each deliverable is included, excluded, or assigned in writing before the team relies on it.
Project requirements, owner standards, applicable references, system boundaries, assumptions, field inputs, and acceptance criteria organized before production starts.
A project-specific Division 27 section index, edited technical requirements, drawing-to-specification cross-checks, and coordination with front-end and related divisions.
Plans, pathways, backbone risers, telecom-room layouts, rack elevations, details, keyed notes, and interfaces developed to the contracted project phase.
Cable, equipment, and labeling schedules plus submittal, testing, record-document, training, warranty, and closeout requirements when included in scope.
Bid questions, addenda inputs, submittal and RFI review, design clarifications, change evaluation, and closeout review against the issued design intent.
A coordinated review of drawings and specifications, tracked comments, named review gates, controlled revisions, and recorded open items before each issue.
Neither document should be treated as boilerplate. Coordination checks the same system, product, test, label, and responsibility across every place it appears.
Locations, routes, topology, quantities, relationships, mounting, room layouts, elevations, keyed details, and discipline interfaces.
Products, performance, substitutions, submittals, installation, testing, labeling, training, warranty, record documents, and closeout.
The QA review looks for mismatched media, counts, section references, product criteria, testing language, responsibilities, and drawing notes before the package is issued.
The project manual assigns the work. This matrix is a coordination checklist, not a substitute for the architect’s, engineer’s, owner’s, or contractor’s contractual responsibilities.
| Interface | Division 27 design intent | Coordination decision to record |
|---|---|---|
| Cabling topology and outlets | Division 27 drawings and schedules commonly define locations, media, topology, quantities, and termination intent. | Confirm owner IT standards, equipment assumptions, final device needs, and installer field verification. |
| Pathways and sleeves | Show route intent, capacity, service entrances, telecom-room interfaces, and coordination requirements. | Assign conduit, tray, sleeves, supports, penetrations, and installation scope to Division 26, 27, or another trade. |
| Power and environment | Document ICT equipment needs, loads, receptacle locations, redundancy assumptions, and room criteria. | Electrical and mechanical disciplines design their systems and confirm capacity, cooling, controls, and emergency-power requirements. |
| Grounding and bonding | Define the telecommunications bonding topology, connection points, labels, and ICT-side requirements. | Coordinate the grounding electrode system, electrical safety requirements, pathway bonding, and installer responsibility. |
| Firestopping and seismic restraint | Identify rated penetrations, support criteria, and project requirements that affect communications work. | The design team and project manual assign engineered details, special inspection, delegated design, and installation responsibility. |
| Security, AV, and electronics | Include only systems explicitly assigned to the Division 27 ICT scope and show known interfaces. | Confirm whether each system belongs in Division 27, Division 28, another consultant package, or owner-furnished work. |
Remote delivery works when current backgrounds, owner standards, procurement requirements, equipment assumptions, and a field-verification plan are named before they affect the contract documents.
The depth changes by project phase, but the sequence keeps drawings, specifications, decisions, and revisions tied to the same design basis.
Review the project manual, owner standards, available backgrounds, system program, drawing conventions, schedule, and jurisdictional requirements.
Identify the required Division 27 sections, related divisions, drawing deliverables, delegated work, and every interface that needs a named owner.
Coordinate notes, details, products, schedules, testing, submittals, and closeout language at the same review milestones.
Compare drawings, specifications, criteria, and comment logs; resolve contradictions or carry a clearly identified open item.
When scoped, answer questions and review submittals, changes, testing, and closeout records against the issued contract intent.
These official sources illustrate the standards layer and how public owners publish their own requirements. Applicable editions and contract requirements must be confirmed for each project.
TIA’s official standard page for telecommunications pathways and spaces.
BICSI’s official source for the current TDMM and distribution-design guidance.
A public-owner example showing that communications master specifications are maintained and revised over time.
A public-owner structured-cabling section illustrating project-specific products, execution, testing, and closeout requirements.
RCDD review covers the agreed ICT design responsibility. It does not replace a licensed PE, architect, code official, or the contractor's obligation to verify field conditions and perform the work correctly.
Need the drawing side in more detail? Review the dedicated structured cabling design service. For room-specific layouts and interfaces, see telecom room design.
Send the project phase, location, available backgrounds, project manual, owner standards, drawing and specification count, schedule, and required RCDD role. You'll get a direct fit assessment and a clear next step.