A disciplined, standards-driven process.

The discomfort of hiring a remote designer is the unknown of how the work gets managed. Here’s how — five phases, deliverable-by-deliverable, with the standard cited.

Phases

Discovery to closeout.

01

Discovery & Requirements

A two-call kickoff. We collect drawings, schedules, and the client's standards. We come back with a fixed proposal and a clear list of unknowns to chase.

Deliverable Project brief / SOW / Risk registerStandard Internal SOP
02

Schematic / Design Development

Block diagrams, room programming, equipment counts, preliminary pathway routing. Reviewed with the project team before we lock geometry.

Deliverable 30% drawing set / Equipment listStandard BICSI TDMM Ch.3
03

Construction Documents & BOM

Full drawing set: cover sheet, plans, risers, elevations, details, specifications. Bill of materials with manufacturer SKUs and quantities the GC can issue for bid.

Deliverable 100% CDs / Spec book / BOMStandard ANSI/TIA-568, -569, -606
04

Review / QA

Internal red-line, then a peer-review pass against a BICSI/TIA checklist. Every finding logged, addressed, and signed off before issue.

Deliverable QA log / Standards traceability matrixStandard BICSI TDMM (current edition)
05

Construction Administration & Closeout

RFI response, submittal review, change-order analysis, live video walks with the on-site team, punch-list, acceptance testing, closeout binder.

Deliverable RFI log / As-builts / Cert binderStandard ANSI/NECA/BICSI 568
Standards we design to

The reference shelf.

Every drawing carries a standards-traceability index citing the specific clause it implements.

BICSI TDMM (current edition)ANSI/TIA-568.0-EANSI/TIA-568.1-EANSI/TIA-568.2-DANSI/TIA-568.3-EANSI/TIA-569-EANSI/TIA-606-CANSI/TIA-607-DANSI/TIA-758-BANSI/TIA-942-CNEC 800 / 770NFPA 99NFPA 72ISO/IEC 11801NESC
Tools we work in

The drafting stack.

We adapt to your team’s stack. These are the tools we hold deep proficiency in.

AutoCADRevitBluebeam RevuNavisworksBIM 360 / ACCProcoreSharePoint / TeamsVisioCable Pro WebiBwave (DAS)Microsoft ProjectSmartsheet
Remote, addressed directly

How an off-site RCDD stays embedded in your team.

The objection people don't quite say out loud, answered point-by-point.

Scheduled around your tempo

We set a coordination cadence and response windows that match your construction schedule, so remote never means out of reach.

Version-controlled files

Your platform -- SharePoint, BIM 360, Procore, Google Drive -- or ours. Every drawing carries a revision block, every change is logged. No more 'which file is current?'

Comms cadence

Weekly 30-minute coordination call, daily availability on Teams or Slack, 24-hour written response to all RFIs and submittals. You always know where the package is.

Stamping & sign-off

Electronic seal carrying the RCDD designation, date, and revision -- consistent with BICSI documentation norms. We cross-coordinate with the project's stamping PE where the AHJ requires it.